For the cambridge shingle nails must be applied into the nailing zone.
Face nailing roof shingles.
What are face nails.
When the pressure is set too high the nails get driven in to the shingles too far plain and simple.
Most roofers use pneumatic nail guns to nail down shingles.
There is a right way and a wrong way to nail a shingle to a roof.
Remember these are just approximations and shouldn t be used as a definite guide.
Fasten shingles with corrosion resistant nails.
To avoid this cancel and sign in to youtube on your computer.
When properly placed the nail will actually catch the top edge of the shingle below it.
That overlap is very important when it comes to nailing techniques.
I believe that there is ice rain shield beneath all of these locations but i am not sure of that.
These nails tend to be.
Shingles six roofing nails or staples per shingle.
There are a number of places where the roofer has face nailed into the shingles shingles just below dormers and at the top of the roof at the ridge.
Drywall ceiling boards require 1 drywall screws every 6 8 while wall boards require drywall screws every 6 8 on the seams and 10 12 in the field.
In face nailing a nail is driven through the face of the board driving down through two overlapping layers into the substrate below.
If this location or depth is off by even a little it can put the shingle at risk of allowing water to penetrate it or it may fly off in high winds.
Use the correct roofing nail material size and grade as specified in the shingle installation instructions.
Tab shingles need two nails on each side of the tab.
To ensure optimal performance of your asphalt roofing shingles be sure to follow these general directions for proper nailing.
Videos you watch may be added to the tv s watch history and influence tv recommendations.
Shingles are designed to be nailed in specific locations and the nail must be driven to a certain depth.
When the nails are located too high on the shingle they never catch the shingle below.
The correct nail must be applied 2 5 cm above the cut out and 2 5 cm from each edge.
Siding is installed with slight overlap between boards a bit like the way shingles are installed.